Hadoop YARN Tutorial – Learn the Fundamentals of YARN Architecture

Last updated on Oct 05,2024 72.2K Views

Hadoop YARN Tutorial – Learn the Fundamentals of YARN Architecture

edureka.co

Hadoop YARN knits the storage unit of Hadoop i.e. HDFS (Hadoop Distributed File System) with the various processing tools. For those of you who are completely new to this topic, YARN stands for “Yet Another Resource Negotiator”. I would also suggest that you go through our Hadoop Tutorial and MapReduce Tutorial before you go ahead with learning Apache Hadoop YARN. I will be explaining the following topics here to make sure that at the end of this blog your understanding of Hadoop YARN is clear.

Why YARN?

In Hadoop version 1.0 which is also referred to as MRV1(MapReduce Version 1), MapReduce performed both processing and resource management functions. It consisted of a Job Tracker which was the single master. The Job Tracker allocated the resources, performed scheduling and monitored the processing jobs. It assigned map and reduce tasks on a number of subordinate processes called the Task Trackers. The Task Trackers periodically reported their progress to the Job Tracker.

This design resulted in scalability bottleneck due to a single Job Tracker. IBM mentioned in its article that according to Yahoo!, the practical limits of such a design are reached with a cluster of 5000 nodes and 40,000 tasks running concurrently. Apart from this limitation, the utilization of computational resources is inefficient in MRV1. Also, the Hadoop framework became limited only to MapReduce processing paradigm. 

To overcome all these issues, YARN was introduced in Hadoop version 2.0 in the year 2012 by Yahoo and Hortonworks. The basic idea behind YARN is to relieve MapReduce by taking over the responsibility of Resource Management and Job Scheduling. YARN started to give Hadoop the ability to run non-MapReduce jobs within the Hadoop framework. 

You can also watch the below video where our Hadoop Certification Training expert is discussing YARN concepts & it’s architecture in detail.

Hadoop Yarn Tutorial | Hadoop Yarn Architecture | Edureka

 

With the introduction of YARN, the Hadoop ecosystem was completely revolutionalized. It became much more flexible, efficient and scalable. When Yahoo went live with YARN in the first quarter of 2013, it aided the company to shrink the size of its Hadoop cluster from 40,000 nodes to 32,000 nodes. But the number of jobs doubled to 26 million per month.

 

Introduction to Hadoop YARN

Now that I have enlightened you with the need for YARN, let me introduce you to the core component of Hadoop v2.0, YARN. YARN allows different data processing methods like graph processing, interactive processing, stream processing as well as batch processing to run and process data stored in HDFS. Therefore YARN opens up Hadoop to other types of distributed applications beyond MapReduce.

YARN enabled the users to perform operations as per requirement by using a variety of tools like Spark for real-time processing, Hive for SQL, HBase for NoSQL and others. 

Apart from Resource Management, YARN also performs Job Scheduling. YARN performs all your processing activities by allocating resources and scheduling tasks. Apache Hadoop YARN Architecture consists of the following main components :

  1. Resource ManagerRuns on a master daemon and manages the resource allocation in the cluster.
  2. Node Manager: They run on the slave daemons and are responsible for the execution of a task on every single Data Node.
  3. Application Master: Manages the user job lifecycle and resource needs of individual applications. It works along with the Node Manager and monitors the execution of tasks.
  4. Container: Package of resources including RAM, CPU, Network, HDD etc on a single node.

Components of YARN

You can consider YARN as the brain of your Hadoop Ecosystem. The image below represents the YARN Architecture.

The first component of YARN Architecture is,

Resource Manager

        a) Scheduler

        b) Application Manager

Coming to the second component which is :

Node Manager

The third component of Apache Hadoop YARN is,

Application Master

The fourth component is:

Container

Application Submission in YARN

Refer to the image and have a look at the steps involved in application submission of Hadoop YARN:

1) Submit the job

2) Get Application ID

3) Application Submission Context

4 a) Start Container Launch

   b) Launch Application Master

5) Allocate Resources

6 a) Container

   b) Launch

7) Execute

Application Workflow in Hadoop YARN

Refer to the given image and see the following steps involved in Application workflow of Apache Hadoop YARN: You can get a better understanding with the Data Engineering Training in India.

  1. Client submits an application
  2. Resource Manager allocates a container to start Application Manager
  3. Application Manager registers with Resource Manager
  4. Application Manager asks containers from Resource Manager
  5. Application Manager notifies Node Manager to launch containers
  6. Application code is executed in the container
  7. Client contacts Resource Manager/Application Manager to monitor application’s status
  8. Application Manager unregisters with Resource Manager

 

Now that you know Apache Hadoop YARN, check out the Hadoop training by Edureka, a trusted online learning company with a network of more than 250,000 satisfied learners spread across the globe. The Edureka’s Big Data Engineering course helps learners become expert in HDFS, Yarn, MapReduce, Pig, Hive, HBase, Oozie, Flume and Sqoop using real-time use cases on Retail, Social Media, Aviation, Tourism, Finance domain.

Got a question for us? Please mention it in the comments section and we will get back to you.

BROWSE COURSES